cmail

Feasibility Study

  • Project Title: Faizabad Small Hydropower Plant
  • Task: Technical assistant in Detail design Feasiblity study drawing Detail Engineering Drawing Preparation
  • Capacity: 4.5 MW
  • Status: Completed
  • View Details »
  • Project Title: Kipchoria Hydropower Scheme
  • Task: Technical assistant in Detail design Feasiblity study drawing Detail Engineering Drawing Preparation
  • Capacity: 3 MW
  • Status: Ongoing
  • View Details »
  • Project Title: North Mathioya Hydropower Scheme
  • Task: Technical assistant in Detail design Feasiblity study drawing Detail Engineering Drawing Preparation
  • Capacity: 3 MW
  • Status: On-going
  • View Details »
  • Project Title: Tagabi Hydropower Scheme
  • Task: Technical assistant in Detail design Feasiblity study drawing Detail Engineering Drawing Preparation
  • Capacity: 1.7 MW
  • Status: Completed
  • View Details »
  • Project Title: Topichi Small Hydropower Project
  • Task: Technical Assistant in Detailed Design, Feasibility Study drawings, detailed Engineering Drawings
  • Capacity: 500 kW
  • Status: Completed
  • View Details »
Recent News
recentImage Contract Agreement with River side Hydro Energy Pvt. Ltd. For Due Diligence Study and Detailed Engineering Design
Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with River side Hydro Energy Pvt. Ltd. to conduct Due Diligence Study and Detailed Engineering Design of Tamor Khola-5 Hydropower Project (37.52 MW) on 24th December 2020.  The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as… Read More »
VIEW ALL NEWS
National Projects
national

Karuwa Seti Hydropower Project (32 MW)
Capacity: 32 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalMicro Hydropowers in Ethiopia (MHPs)
Capacity: N/A
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations