Due Diligence Study

In due diligence study, an independent review of all the information provided by the client (reports, drawings, construction methodology, etc) is done. We also verify all hydropower components meets necessary hydraulic and structural requirements. The project site is inspected to acknowledge any geological and environmental constraints. And finally due diligence report based on the findings of site inspection and the review of the documents is forwarded to the client. This report can help to identify any constraints in the early stage of project construction.

Recent News
recentImage Contract Agreement with Super Madi Hydropower Limited for Construction Management and Construction Supervision
Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Super Madi Hydropower Limited to conduct Construction Management and Construction Supervision of Super Madi Hydroelectric Project (44 MW) on 9th April 2018.  The project is located in Madi Gaupalika of Kaski District of Nepal. It has been planned as a run-of-the-river (RoR)… Read More »
VIEW ALL NEWS
National Projects
national

Lower Likhu Hydropower Project
Capacity: 28.1 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalAchranich Bridge, UK
Capacity: 100 kW
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
Shankha Park, Dhumbarahi,
Kathmandu, Nepal
P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: sanima@sanimahydro.com
footlogo© 2016 Sanima Hydro & Engineering (P.) Ltd | All rights reserved
Website Design & Web Development by Axil Creations