cmail

Due Diligence and Short Term Study

  • Project Title: Karuwa Seti Hydropower Project (32 MW)
  • Task: Due Diligence Study
  • Capacity: 32 MW
  • Status: Ongoing
  • View Details »
  • Project Title: Nyasim Khola Hydropower Project (35 MW)
  • Task: Due Diligence Study
  • Capacity: 35 MW
  • Status: Ongoing
  • View Details »
  • Project Title: Super Kabeli Khola-A Hydropower Project (13.50 MW)
  • Task: Due Diligence Study and Detailed Engineering Design
  • Capacity: 13.50 MW
  • Status: Ongoing
  • View Details »
  • Project Title: Super Kabeli Khola Hydropower Project (12 MW)
  • Task: Due Diligence Study and Detailed Engineering Design
  • Capacity: 12 MW
  • Status: Ongoing
  • View Details »
  • Project Title: Kasuwa Khola Hydropower Project (45 MW)
  • Task: Due Diligence Study
  • Capacity: 45 MW
  • Status: Completed
  • View Details »
Recent News
recentImage Contract Agreement with River side Hydro Energy Pvt. Ltd. For Due Diligence Study and Detailed Engineering Design
Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with River side Hydro Energy Pvt. Ltd. to conduct Due Diligence Study and Detailed Engineering Design of Tamor Khola-5 Hydropower Project (37.52 MW) on 24th December 2020.  The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as… Read More »
VIEW ALL NEWS
National Projects
national

Karuwa Seti Hydropower Project (32 MW)
Capacity: 32 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalMicro Hydropowers in Ethiopia (MHPs)
Capacity: N/A
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations