
- Project Title: Upper Sankhuwa Khola Hydroelectric Project (40 MW)
- Task: Detailed Engineering Design
- Capacity: 40 MW
- Status: Completed
- View Details »

- Project Title: Lower Likhu Hydropower Project
- Task: Preparation of Bid Documents and Detailed Engineering Designs
- Capacity: 28.1 MW
- Status: Completed
- View Details »
- Project Title: Upper Tamor Hydropower Project
- Task: Preparation of Detailed Project Report, Tender Documents and Additional Engineering Support.
- Capacity: 285 MW
- Status: Completed
- View Details »

- Project Title: Likhu-A Hydroelectric Project
- Task: Preparation of Detailed Designs, Construction Drawings and Tender Documents
- Capacity: 29 MW
- Status: Completed
- View Details »

- Project Title: Mathillo Mailung Jalvidhyut Aayojana
- Task: Detailed Design and Construction Supervision
- Capacity: 14.3 MW
- Status: Ongoing
- View Details »