Project Title: Mai Cascade HP

innerImage
  • Task: Desk study Licensing and Feasibility study preparation of Tender document Detailed engineering design Construction Supervision

  • Capacity: 7 MW

  • Status: Completed

SALIENT FEATURES:

 Location:
1.1 Region Eastern Development Region
1.2 District Ilam
1.3 Zone Mechi
1.4 Village Danabari VDC
1.5 Access to the project site Via. East-west highway upto Birtamode and about 30 km long blacktopped/ graveled link road north from Birtamod
1.6 Geographic Coordinates
  • Longitude
87052’1.92” E to 87053’9.16” E
  • Latitude
27045’43.37” N to 27047’39.78” N
1.7 Altitude 155 – 200 m (amsl)
River Catchment
2.1 Catchment 589.0 km2
2.2 Name of River Mai Khola
Diversion Structure (Headworks)
3.1 Type of Structure Canal Diversion (cascade to MHP)
3.2 Type of Trench Rectangular and Trapezoidal Channel
3.3 Tail water level (El. m) at Powerhouse of MHP.
  • Maximum
199 m (masl)
  • Minimum
198.15 m (masl)
3.4 Maximum discharge capacity (Cumecs) 23.40 m3/s
3.5 Gates on entry to intake chamber No
3.6 Headrace Canal/Culvert
  • Total Length
3655 m
  • Size
Rectangular: Height = (3.0 + 0.5) m, Width = 3.5 m, Trapezoidal: Bottom width = 2.5 m, Top width = 6.9 m, Height = (2.2+1) m
  • HR culvert (Trapezoidal)
L= 1720 m
  • HR culvert (Rectangular)
L= 1935 m
Kholsi Crossing System
4.1 Kholsi Crossings (With rectangular culvert)
  • Crossing No.- 1
LxBxH = (14.3 x 5.4 x 5.3) m
  • Crossing No. – 2
LxBxH = (11.0 x 9.7 x 3.3) m
  • Crossing No. – 3
LxBxH = (14.3 x 5.4 x 4.3) m
  • Crossing No. – 4
LxBxH = (14.3 x 5.4 x 7.8) m
  • Crossing No. – 5
LxBxH = (14.3 x 5.4 x 4.3) m
  • Crossing No. – 6
LxBxH = (14.3 x 5.4 x 8.7) m
  • Crossing No. – 7
LxBxH = (14.3 x 5.4 x 8.7) m
  • Crossing No. – 8
LxBxH = (10.8 x 5.4 x 2.8) m
  • Crossing No. – 9
LxBxH = (14.3 x 5.4 x 11.5) m
4.2 Kholsi Crossings (With hume pipe arrangement)
  • Crossing No. – 01
LxBxH = (15.7 x 13.5 x 2.5) m
  • Crossing No. – 02
LxBxH = (10.2 x 7.9 x 3.8) m
  • Crossing no. – 03
LxBxH = (10.2 x 7.9 x 3.9) m
  • Crossing No. – 04
LxBxH = (15.2 x 9.3 x 2.8) m
Forebay
5.1 Size of Forebay LxBxH = 67 x 19.1 x 9.1 m
5.2 Full Forebay level (El.m) 193.19 m amsl.
Penstock
6.1 Number 1(Up to wyee), 3(After wyee)
6.2 Diameter/Thickness Dia. = 2.6 m (Up to wyee), 1.5 m (After wyee) /10-14 mm thick
6.4 Length 27m (Up to wyee), 33 m (After wyee)
6.5 Size of gate on Penstock in Forebay BxH = 3.2 m x 3.2 m
6.6 Trifurcation Trifurcation from 2.6 m to three branches of 1.5 m diameter
Powerhouse
7.1 Type Surface
7.2 Head
  • Gross head (from MHP Tailrace)
42.65 m
  • Net head
34.59 m
7.3 Turbine
  • Type
Francis (Horizontal Shaft)
  • Number
3
  • Output
2450 kW
7.4 Powerhouse size
  • Length
57.30 m
  • Width
15.20 m
  • Height
9.3 m up to crane beam rail
7.5 Tailrace
  • Type
RCC open canal
  • Length
140 m
  • Width
4.0 m
  • Height
3.8 m
7.6 Installed capacity (kW) 3 x 2333.3 kW
7.7 Type of generator
Generator specification Synchronous salient pole type 2917 kVA, 6.3 kV, 0.8 power factor
  • Excitation System
Digital Static Self Excitation
  • Regulation System
AVR type
7.8 Powerhouse crane /lifting tackle capacity 24 ton
8 Power
8.1 Installation capacity 7000 kW
9 Switchyard
9.1 Voltage level 33 kV
9.2 No. of bays 1
Recent News
recentImage Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW)
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited on 14th February 2024 for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically,… Read More »
VIEW ALL NEWS
National Projects
national

Jum Khola Jalvidhyut Aayojana
Capacity: 56 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations