cmail

News

Contract Agreement with Super Madi Hydropower Limited for Construction Management and Construction Supervision

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Super Madi Hydropower Limited to conduct Construction Management and Construction Supervision of Super Madi Hydroelectric Project (44 MW) on 9th April 2018.  The project is located in Madi Gaupalika of Kaski
District of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 44 MW, design discharge 18 m3/sec, gross head of 306.5 m.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations