cmail

News

Contract Agreement with SSCE-High Himalaya JV

innerImage

Sanima Hydro and Engineering has signed a Contract Agreement with SSCE – High Himalaya Hydro Construction Pvt. Ltd. JV on 28th May 2023 for Detailed Engineering Design and Technical Support during Construction of EPC Construction of Rolwaling Khola Hydroelectric Project (20.66 MW). Rolwaling Khola Hydroelectric Project is a Run – of – River (R0R) having an installed capacity of 20.66 MW located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is located between latitudes 27° 55’ 14.40” N to 27° 53’ 30.9” N and longitudes 86° 12’ 59.43” E to 86° 15’ 17.93” E. The project utilizes gross head of 220.50 m, m and design discharge of 13.4 m3/s.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations