cmail

News

Contract Agreement with River side Hydro Energy Pvt. Ltd. For Due Diligence Study and Detailed Engineering Design

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with River side Hydro Energy Pvt. Ltd. to conduct Due Diligence Study and Detailed Engineering Design of Tamor Khola-5 Hydropower Project (37.52 MW) on 24th December 2020.  The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with an installed capacity of 37.52 MW, design discharge 55.0 m3/sec, and gross head of 80 m.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations