cmail

News

Contract Agreement with Makari Gad Hydropower Limited

innerImage

Sanima Hydro and Engineering Pvt. Ltd signed a contract agreement with Makari Gad Hydropower Limited for Due Diligence Audit on Project Cost Variation of Makari Gad Hydroelectric Project – 10 MW on 5th February, 2023. The project is located Darchula District, Sudurpaschim Province of Nepal. It is a run-of-river hydropower project having installed capacity of 10 MW located at in Darchula District, Sudurpaschim Province of Nepal. Geographically, the project area is located between Longitudes 80°52′ 47″ E to 80°50’33” E and Latitudes 29°48’03” N to 29°46’54” N. The project comprises weir, intake gravel trap, desanding basin, forebay, penstock chamber, penstock pipe, powerhouse and tailrace canal. The project utilizes gross head of 925.21m, design discharge of 1.35 m3/s at Q47% resulting into an installed capacity of 10 MW.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations