cmail

News

Contract Agreement with Integrated Hydro Fund Nepal Pvt. Ltd. for Consulting Services for Due Diligence Study

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Integrated Hydro Fund Nepal Pvt. Ltd. for Consulting Services for Due Diligence Study of Upper Brahmayani Hydroelectric Project (15.15 MW) on 10th December, 2021. The project is located in Sindhupalchowk district, Bagmati Province of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 15.15 MW, design discharge at Q45 4.02 m3/sec, and gross head of 463.0 m and net head of 444.44.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations