cmail

News

Contract Agreement with Balephi Hydropower Ltd.

innerImage

Sanima Hydro and Engineering Pvt. Ltd signed a contract agreement with Balephi Hydropower Ltd. for Due Diligence Audit on Project Cost Variation of Upper Balephi A Hydroelectric Project – 36 MW on 5th February, 2023. The project is located Sindhupalchowk District, Bagmati Province of Nepal. It is a run-of-river hydropower project. Geographically, the project area is located between Latitudes 27°57’00” N to 27°53’45”N and Longitudes 85°47’40” E to 85°45′ 30” E. The project comprises diversion weir, intake, under sluice, gravel trap, approach culvert, settling basin, by-pass channel, inverted siphon, settling basin outlet pond, adit, surge shaft, penslock, vertical penstock shaft and powerhouse. The project utilizes gross head of 207 m, rated net head of 201.71m and design discharge at Q40% o123.5 m3/s resulting into an installed capacity of 36 MW.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations