cmail

News

Consulting Services for Detailed Engineering Design for Pegu Khola Small Hydropower Project

innerImage

Sanima Hydro and Engineering Pvt. Ltd. has signed a contract with Bigu Hydro Venture Pvt. Ltd. to provide consulting services for Detailed engineering design of the Pegu Khola Small Hydropower Project, a 3 MW Run-of-River (RoR) scheme located in Dolakha District.

The license boundary of the project stretches within Latitudes 27⁰50’18” N to 27⁰49’22” N and Longitudes 86⁰04’59” E to 86⁰03’21.5” E. The major components of the project are Diversion weir, Intake cum Gravel Trap, Approach Canal, Desanding Basin, Headrace pipe, Forebay, Steel Penstock Pipe, Powerhouse and Tailrace. The project has installed capacity of 3 MW with design discharge of 1.95 m3/sec and rated net head of 182.22 m. The project is capable of delivering 16.245 GWh of energy annually to NEA substation (Singati Lamosanghu, 132/33 kV, 30 MVA) at Singati of Dolakha district.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations