cmail

Board of Directors

Mr. Tuk Prasad Paudel

Mr. Paudel is a Hydropower Engineer, with a Masters Degree in Hydraulics and Hydropower. He has 22 years of experience in Hydropower Projects’ study, planning,   project management and its development. He was a Chief Executive officer of Sanima Mai Hydropower Ltd. During his tenure he was involved in overall development of 22MW Mai Hydropower Project and 7 MW Mai Cascade Hydropower Project in Nepal. At present the projects are under construction. Currently, he is an Executive Chairman of Sanima Hydro and Engineering (P) Ltd.He is responsible for the overall management of the company.

 

Mr. Ajoy Karki

Mr. Karki is a water resources engineer with 23 years experience in the management, design and study of hydropower, rural electrification and renewable energy projects in Nepal as well as at international level. He holds a Masters Degree in Hydraulic Engineering (Specialization in River Engineering and River Basin Development) from IHE-UNESCO, The Netherlands (2000). His international experience covers over 14 countries in Asia and Africa for multinational agencies such as the Asian Development Bank, World Bank, GIZ, German Bank for Reconstruction (KfW), USAID, UNEP and Winrock International. He is the Director of Sanima Hydro and Engineering (P.) Ltd.

 

Mr. Kieron Paul Hanson

Mr. Kieron Paul Hanson is the founder and Managing Director of Hydroplan, a leading hydropower consulting company in UK. He has over 30 years of experience in design, installation and commissioning of hydropower plants throughout the U.K, Spain, Portugal, Kenya, Malaysia and Pakistan. Hydroplan has 3 offices in the UK and undertakes consents, design and construction management of small to medium hydro projects.  Kieron is one of the board members of Sanima Hydro and Engineering P. Ltd and also a board member of the British Hydropower Association.

Mr. Subas Chandra Sunuwar

Mr. Subas Chandra Sunuwar is an Engineering Geologist, with a Masters Degree in Engineering Geology. He has 21 years of experience in Nepal and India with expertise in Engineering Geology and Geo-technical Studies. During his tenure he was involved in project identification, site investigation, feasibility study, detailed design and construction supervision of hydro projects.

 

Recent News
recentImage Contract Agreement with Super Madi Hydropower Limited for Construction Management and Construction Supervision
Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Super Madi Hydropower Limited to conduct Construction Management and Construction Supervision of Super Madi Hydroelectric Project (44 MW) on 9th April 2018.  The project is located in Madi Gaupalika of Kaski District of Nepal. It has been planned as a run-of-the-river (RoR)… Read More »
VIEW ALL NEWS
National Projects
national

Lower Likhu Hydropower Project
Capacity: 28.1 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalAchranich Bridge, UK
Capacity: 100 kW
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
Shankha Park, Dhumbarahi,
Kathmandu, Nepal
P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: sanima@sanimahydro.com
footlogo© 2016 Sanima Hydro & Engineering (P.) Ltd | All rights reserved
Website Design & Web Development by Axil Creations