Contract Agreement with Siuri Nyadi Power Ltd. For Review Report of Road Access Tunnel

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement on 14th March, 2021 to conduct a review of Road Access Tunnel of Super Nyadi Hydropower Project (40.27 MW), promoted by Siuri Nyadi Power Ltd. The project is located in Lamjung district, Gandaki Province of Nepal. Under the contract agreement, SHEPL shall be involved in performing review and independent analysis… Read More »


Contract Agreement with Happy Energy Pvt. Ltd. for Review Report

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Happy Energy Pvt. Ltd. for Consulting Services for Review Report of Upper Sankhuwa Khola Hydroelectric Project (40 MW) on 15th February, 2021. The project is located in Sankhuwasabha district, Province No.1 of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 40 MW,… Read More »


Contract Agreement with River Side Hydro Energy Pvt. Ltd. for Consulting Services for Due Diligence Study and Detailed Engineering Design

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with River Side Hydro Energy Pvt. Ltd. for Consulting Services for Due Diligence Study and Detailed Engineering Design of Tamor Khola-5 Hydroelectric Project (37.52 MW) on 24th December, 2020. The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as a run-of-river (RoR) type scheme… Read More »


Contract Agreement with Tamor Sanima Energy Pvt. Ltd. for Consulting Services for Initial Environmental Examination Study

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Tamor Sanima Energy Pvt. Ltd. for technical consulting services for Initial Environmental Examination Study of 220kV Double Circuit Transmission Line of Upper Tamor Hydropower Project on 29th July, 2020. The total length of the project starting from the switchyard of UTHP (located in Sisme Khola crossing, Phunglin Municipality) upto… Read More »


Contract Agreement with River side Hydro Energy Pvt. Ltd. For Due Diligence Study and Detailed Engineering Design

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with River side Hydro Energy Pvt. Ltd. to conduct Due Diligence Study and Detailed Engineering Design of Tamor Khola-5 Hydropower Project (37.52 MW) on 24th December 2020.  The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with an… Read More »


Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing