cmail

News

Contract Agreement with Happy Energy Pvt. Ltd. for Detailed Engineering Design

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Happy Energy Pvt. Ltd. for Detailed Engineering Design of Upper Sankhuwa Khola Hydroelectric Project (40 MW) on 7th April, 2021. The project is located in Sankhuwasabha district, Province No.1 of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 40 MW, design discharge of 9.75 m3/sec, and gross head of 481.69 m.

Recent News
recentImage Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW)
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited on 14th February 2024 for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically,… Read More »
VIEW ALL NEWS
National Projects
national

Jum Khola Jalvidhyut Aayojana
Capacity: 56 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations