![](https://sanimaengineering.com/wp-content/uploads/2023/06/webpnet-resizeimage-10-1-1.jpg)
- Project Title: Rolwaling Khola Hydroelectric Project (20.66 MW)
- Task: Detailed Engineering Design and Technical Support during Construction
- Capacity: 20.66 MW
- Status: Ongoing
- View Details »
![](https://sanimaengineering.com/wp-content/uploads/2023/05/Upper-Trishuli.jpg)
- Project Title: Upper Trishuli -1 Hydropower Project
- Task: Engineering Services
- Capacity: 216 MW
- Status: Ongoing
- View Details »
![](https://sanimaengineering.com/wp-content/uploads/2022/08/Upper-Tamor.jpg)
- Project Title: Upper Tamor
- Task: Detailed Engineering Design and Design Support
- Capacity: 285 MW
- Status: Completed
- View Details »
![](https://sanimaengineering.com/wp-content/uploads/2022/07/Tamor-Khola-5.jpg)
- Project Title: Tamor Khola -5 Hydropower Project
- Task: Headworks & Headrace Tunnel Resizing and Powerhouse Layout Modifications
- Capacity: 37.5 MW
- Status: Completed
- View Details »
![](https://sanimaengineering.com/wp-content/uploads/2021/08/Middle-Tamor.jpg)
- Project Title: Middle Tamor Hydropower Project
- Task: Feasibility Study, Supplementary EIA, Bid Documents and Detailed Engineering Designs and Drawings Preparation
- Capacity: 73 MW
- Status: Completed
- View Details »