Sanima Hydro and Engineering Pvt. Ltd. has signed a Contract Agreement with Melamchi Hydro Pvt. Ltd. on 6th December 2023 for Due Diligence Study of “Ribal Khola Small Hydropower Project (998 kW)”. It is a Run of River (RoR) project located in Helambu -1, Sindhupalchowk District, Bagmati Province of Nepal. Geographically, the project area is located between Latitudes 27° 58′ 56″ N to 27° 59′ 22″ N and Longitudes 85° 30′ 51″ E to 85° 32′ 03” E. The project utilizes gross head of 460.8 m and design discharge of 0.269 m3/s.