cmail

News

Due Diligence Audit of Phedi Khola Hydropower Project (4.3 MW)

innerImage

Sanima Hydro and Engineering Pvt. Ltd. has signed a Contract Agreement with Phedi Khola Hydropower Company Pvt. Ltd. on 10th December 2023 for Due Diligence Study of “Phedi Khola Hydropower Project (4.3 MW)”. It is a Run of River (RoR) project located in Bhojpur District, Koshi Province of Nepal. Geographically, the project area is located between Latitudes 27⁰22’13” N to 27⁰23’06” N and Longitudes 87⁰00’29” E to 87⁰01’38” E. The major components of the project are diversion weir, intake structure gravel trap, settling basin, headpond portion, steel penstock pipe, bifurcated pipe, tailrace and powerhouse. The project utilizes gross head of 180.50 m, net head of 171.58m and design discharge at Q40% of 2.96 m3/s.

Recent News
recentImage Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW)
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited on 14th February 2024 for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically,… Read More »
VIEW ALL NEWS
National Projects
national

Jum Khola Jalvidhyut Aayojana
Capacity: 56 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations