Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Swet Ganga Hydropower and Construction Limited to conduct Construction Supervision of Lower Likhu Hydropower Project (28.1 MW) on 21th September 2017. The project is located in Sirise, Saipu and Bijulikot VDCs of Ramechhap and Okhaldhunga Districts of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 28.1 MW, design discharge 29.75 m3/sec, gross head of 118 m.