cmail

News

Contract Agreement with Super Madi Hydropower Limited for Construction Management and Construction Supervision

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Super Madi Hydropower Limited to conduct Construction Management and Construction Supervision of Super Madi Hydroelectric Project (44 MW) on 9th April 2018.  The project is located in Madi Gaupalika of Kaski
District of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 44 MW, design discharge 18 m3/sec, gross head of 306.5 m.

Recent News
recentImage Contract Agreement with Machhapuchchhrre Bank Limited and Vision Energy and Power Pvt. Ltd. For Due Diligence Study
Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Machhapuchchhrre Bank Limited and Vision Energy and Power Pvt. Ltd. to conduct Due Diligence Study of Nupche Likhu Hydropower Project (57.5 MW) on 28th August 2018. The project is located Ramechhap district of Nepal. It has been planned as a run-of-the-river (RoR) type… Read More »
VIEW ALL NEWS
National Projects
national

Likhu-A Hydroelectric Project
Capacity: 29 MW
Status: Completed
VIEW MORE PROJECTS
International Projects
nationalMicro Hydropowers in Ethiopia (MHPs)
Capacity: N/A
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations