Sanima Hydro and Engineering has signed a Contract Agreement with Makar Jitumaya Suri Hydropower Ltd. for Supplementary Due Diligence Study of Upper Suri Khola Hydropower Project (7 MW) on June 26, 2023 . Upper Suri Khola Hydropower Project (7 MW) is located in Dolakha District, Bagmati Province of Nepal. Geographically, the project area is located between Longitudes 86° 15’ 10” E to 86° 17’ 00” E and Latitudes 27° 43’ 30” N to 27° 44’ 30” N. This is a Run-of-river type project with weir crest level at 1827 amsl for Hulak Khola, 1824 amsl for Kolung Khola and turbine axis fixed at elevation at 1405 amsl. The gross head of the project is 422m.