Sanima Hydro and Engineering Pvt. Ltd. Has signed a contract agreement with Swet Ganga Hydropower and Construction Ltd. for Feasibility Study of Tallo Likhu Cascade Jalvidhyut Aayojana (9500 kW) on August 27, 2023. Tallo Likhu Cascade Jalvidhyut Aayojana is a Run-of-River (RoR) having an installed capacity of 9500 kW located at Likhu Tamakoshi Rural Municipality, ward no. 4, and Ramechhap Municipality, ward no. 1 of Ramechhap District & Likhu Rural Municipality, ward no 3 and 4 of Okhaldhunga District. Geographically, the project area is located between latitudes 270 22’ 00” N to 270 23’ 23” N and longitudes 860 13’ 10” E to 860 14’ 02” E. The project utilizes gross head of 41.0 m, and design discharge of 29.75 m3/s.