Project Title: Thotnae Khola HP

innerImage
  • Task: Feasibility study

  • Capacity: 74 KW

  • Status: Completed

Salient Features (as per Feasibility Study Report, 2010):
Location : Thotane Khola, Bhadaure/Mamkha VDC’s, Okhaldunga District, Sagarmatha Zone, Eastern development region of Nepal
Latitude : 27°16’25” N to 27°17’20” N
Longitude : 86°35’00” E to 86°36’57” E.
Geology
Region : Lesser Himalayan Zone
Rock composed : Quartzite, Phyllite
Geotechnical zoning : Very poor to fair
Hydrology
Catchment area : 71 km2
90% firm flow in the driest month : 0.36 m3/s
Design flow (Q40) : 1.14 m3/s
Flood 1 in 100 years : 338 m3/sec
Weir
Type : boulder lined
Length : 23.85 m
Crest level : 713.00 m amsl
Intake
Type : Semi frontal intake
Number of orifice : 3
Orifice Size : 0.5 x 1.00 m (w x h)
Invert level orifice : 712.00 m amsl
Number of gates : 3
Gravel trap
Type : Surface
Length : 5.00 m (including transition)
Width : 2.3 m
Height : 3.5 m
Spillway level : 713.00 m amsl
Gravel Flushing Canal
Type : Surface
Length : 50.60 m
Breadth : 1.00 m
Height : 1.95 m
Number of gates : 1 nos.
Approach canal
Type : Reinforced concrete rectangular culvert
Length : 6.90 m
Bottom width : 2.30 m
Height : 1.76 m
Settling basin
Type : Surface
Size : 28 x 5 x 3.28 m (l x b x h)
No. of chambers : 2
No. of flushing channel : 2
Sediment Flushing Channel
Type : Surface
Length : 14.23 m
Breadth : 0.5 m
Height : 0.5 m
No. of gates : 2
Forebay
Type : Surface
Width : 5.25 m
Length : 4.1 m
Height : 2.84 m
Penstock Pipe
Material : Steel
Length : 2361 m
Internal diameter : 800 mm
Thickness : 8-16 mm
Anchor blocks : 36 nos.
Y-Bends : 1 no.
Branching : 2 pipes of 570 mm internal diameter, 21 m long
Powerhouse
Type : Surface
Length : 16.5 m
Breadth : 8.0 m
Height : 12 m (from foundation level)
Number of generating units : 2 (Two) each 340 KW
Turbine type : Horizontal Axis Francis Turbine
Installed capacity : 680 KW
Tail water level : 622.00 m amsl
Tailrace
Type : Rectangular box culvert
Height : 0.9 m
Width : 1.5 m
Length of closed duct : 11.90 m
Transmission Facilities
Transmission line length : 3 km from Powerhouse to Mathilo Bhadaure (the existing 11 KV transmission line)
Voltage level : 11 KV
Power and Energy
Gross Head : 91 m
Net Head at design discharge : 73.20 m (at design discharge)
Installed Capacity : 680 KW
Gross Annual Energy : 4.41 GWh
Net Annual energy : 4.24 GWh
Wet Energy : 3.28 GWh
Dry Energy : 0.95 GWh
Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations