cmail

Project Title: Mai Hydropower Project

innerImage
  • Task: Desk study,Licensing and Feasibility study,preparation of Tender document, Detailed engineering design, Construciton Supervision

  • Capacity: 22 MW

  • Status: Completed

1. General
Project Mai Hydropower Project (22 MW)
Purpose of the Project To supply for domestic use of connecting to national grid
Location Danabari and Chisapani VDC,Illam District , Eastern Development Region of Nepal
2. Hydrology
Catchment area 589.0 km2
Mean Annual Dishcharge 31.77m3/sec
Design Discharge (at 40%PoE) 23.40 m3/s
Riparian Release 0.72 m3/s
Design flood Discharge 2070 m3/s (100Yr. Flood)
Average Annual Precipitation 2500mm
3. Diversion Weir
Type of Weir Concrete gravity dam
Length of Weir 86.00m
Max. Height of Weir 11.00m
Crest Elevation EL.321.10 m
4. Intake Structure
Type Frontal Intake, submerged
Size 2.55 m x 6.00 m
Nos 3 (Three)
Crest elevation of Orifice EL. 318.50 m
5. Undersluice Structure
Type Over-flow weir with undersluice
Crest Elevation 2.00 m x 4.00 m
Nos 3 (Three)
Crest elevation of undersluice EL. 314.50 m
6. Intake Canal
Type Rectangular, RCC open type
Maximum height 7.50 m
Average Width 4.0 m
Side Spillway crest elevation EL. 321 m
Spillway length 11.90 m
7. Approach Culvert
Type RCC pressurized conduit
Nos 2 (Two)
Length
80.00 m
Size (Width x Depth) 2.00 m x 2.50 m
8. Decending Basin
Type Convensional flushing
No of Bays 4 (Four)
Dimention (L x B x H) 75.00 m x 19.50 m x 5.85 m
Practicle Size to be settled 0.2 mm
9. Headrace culvert
Type RCC pressurized conduit
Length 1072 m
Size (Width x Depth) 3.5 m x 3.30 m
Bed Slope 1.083333333
10. Headrace Tunnel
Type Inverted D-Shaped
Length 2192.0 m (including 66 m after surge-tank)
Tunnel area 13.10 m2/s
11. Surge Tank
Type Vertical, circular section
Diameter 8.00 m
Height 35 m
12. Penstock
Type Exposed on surface
Internal Diameter 2.60 m
Length 316.38 m
Max Steel Thickness 25 mm
Nos of Suppports 51
Nos of Anchor Blocks 8
13. Powerhouse
Type Semi-surface
Size 37 m x 22 m
Height 9.75 m
P/H Floor Level EL.205 m
14. Tailrace Culvert
Type Rectangular, RCC
Length 229.49 m
Size 3.50 m x 3.30 m
Tail Water Level EL. 199.00 m
15. Turbine
Type Vertical Axis Francis
Number 3 (Three)
Rated Output Capacity 3*7600kW
Efficiency 92.50%
16. Governor
Type Electronic with PID Control
Adjustment for Speed Drop Between 0 to 5%
17. Generator
Type Synchronous 3 Phase
Rated output Capacity per Unit 9170 KVA
Nos of Units 3 (Three)
Power Factor 0.8
Voltage 6.3 kV
Frequency 50 Hz
Excitation System Brushless
Efficiency 96.50%
18. Transformer
Type Three phase
Rated Capacity 10,000 KVA and 20,000 KVA
Voltage Ratio 6.3 / 132 kV
Efficiency 99.00%
19. Transmission Line
Voltage Level 132 kV
Length 11.60 Km
Conductor ACSR “WOLF”
From Powerhouse
To Proposed NEA Sub-Station at Godak, Ilam
20. Project Cost Estimate
Total Cost of the Project 3097.50 Millions NRs
21. Construction Period
      52 Months after signing PPA of 15.6MW
22. Other:
   Facilites for Black Start, Off Grid Mode Operaion or Local Grid Mode Operation shall be incorporated in the Project.
Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations