1. General |
Project |
Mai Hydropower Project (22 MW) |
Purpose of the Project |
To supply for domestic use of connecting to national grid |
Location |
Danabari and Chisapani VDC,Illam District , Eastern Development Region of Nepal |
2. Hydrology |
Catchment area |
589.0 km2 |
Mean Annual Dishcharge |
31.77m3/sec |
Design Discharge (at 40%PoE) |
23.40 m3/s |
Riparian Release |
0.72 m3/s |
Design flood Discharge |
2070 m3/s (100Yr. Flood) |
Average Annual Precipitation |
2500mm |
3. Diversion Weir |
Type of Weir |
Concrete gravity dam |
Length of Weir |
86.00m |
Max. Height of Weir |
11.00m |
Crest Elevation |
EL.321.10 m |
4. Intake Structure |
Type |
Frontal Intake, submerged |
Size |
2.55 m x 6.00 m |
Nos |
3 (Three) |
Crest elevation of Orifice |
EL. 318.50 m |
5. Undersluice Structure |
Type |
Over-flow weir with undersluice |
Crest Elevation |
2.00 m x 4.00 m |
Nos |
3 (Three) |
Crest elevation of undersluice |
EL. 314.50 m |
6. Intake Canal |
Type |
Rectangular, RCC open type |
Maximum height |
7.50 m |
Average Width |
4.0 m |
Side Spillway crest elevation |
EL. 321 m |
Spillway length |
11.90 m |
7. Approach Culvert |
Type |
RCC pressurized conduit |
Nos |
2 (Two) |
Length |
|
80.00 m |
Size (Width x Depth) |
2.00 m x 2.50 m |
8. Decending Basin |
Type |
Convensional flushing |
No of Bays |
4 (Four) |
Dimention (L x B x H) |
75.00 m x 19.50 m x 5.85 m |
Practicle Size to be settled |
0.2 mm |
9. Headrace culvert |
Type |
RCC pressurized conduit |
Length |
1072 m |
Size (Width x Depth) |
3.5 m x 3.30 m |
Bed Slope |
1.083333333 |
10. Headrace Tunnel |
Type |
Inverted D-Shaped |
Length |
2192.0 m (including 66 m after surge-tank) |
Tunnel area |
13.10 m2/s |
11. Surge Tank |
Type |
Vertical, circular section |
Diameter |
8.00 m |
Height |
35 m |
12. Penstock |
Type |
Exposed on surface |
Internal Diameter |
2.60 m |
Length |
316.38 m |
Max Steel Thickness |
25 mm |
Nos of Suppports |
51 |
Nos of Anchor Blocks |
8 |
13. Powerhouse |
Type |
Semi-surface |
Size |
37 m x 22 m |
Height |
9.75 m |
P/H Floor Level |
EL.205 m |
14. Tailrace Culvert |
Type |
Rectangular, RCC |
Length |
229.49 m |
Size |
3.50 m x 3.30 m |
Tail Water Level |
EL. 199.00 m |
15. Turbine |
Type |
Vertical Axis Francis |
Number |
3 (Three) |
Rated Output Capacity |
3*7600kW |
Efficiency |
92.50% |
16. Governor |
Type |
Electronic with PID Control |
Adjustment for Speed Drop |
Between 0 to 5% |
17. Generator |
Type |
Synchronous 3 Phase |
Rated output Capacity per Unit |
9170 KVA |
Nos of Units |
3 (Three) |
Power Factor |
0.8 |
Voltage |
6.3 kV |
Frequency |
50 Hz |
Excitation System |
Brushless |
Efficiency |
96.50% |
18. Transformer |
Type |
Three phase |
Rated Capacity |
10,000 KVA and 20,000 KVA |
Voltage Ratio |
6.3 / 132 kV |
Efficiency |
99.00% |
19. Transmission Line |
Voltage Level |
132 kV |
Length |
11.60 Km |
Conductor |
ACSR “WOLF” |
From |
Powerhouse |
To |
Proposed NEA Sub-Station at Godak, Ilam |
20. Project Cost Estimate |
Total Cost of the Project |
3097.50 Millions NRs |
21. Construction Period |
52 Months after signing PPA of 15.6MW |
22. Other: |
Facilites for Black Start, Off Grid Mode Operaion or Local Grid Mode Operation shall be incorporated in the Project. |