Project Title: Lower Modi I Hydroelectric Project

  • Task: Progress monitoring and verification of construction work

  • Capacity: 10 MW

  • Status: Completed

Salient features as per Project Description Report

1.    GENERAL

a. Project Location : Deopur,Bajung,Tilahar and Chuwa VDC, Parbat District
b. Development region : Western Development Region
d. Nearest highway : Pokhara- Baglung Highway

2. LOCATION (THE BOUNDARY POINTS OF THE PROJECT AREA):

Point Longitude Latitude
1 830 42’ 30” E 280 14’ 08” N
2 830 42’ 30” E 280 16’ 18” N
3 830 44’ 43” E 280 14’ 08” N
4 830 44’ 43” E 280 16’ 18” N

3.    HYDROLOGY

a. Catchment Area 560 km2
b. Design discharge 27.5 m3/s (from the provided study report)
c. 100 years flow 1070 m3/s (from the provided study report)
d. Downstream release

e. Modi Khola

40% Exceedence flow

90% Exceedence flow

10% of least mean monthly flow

27.5 m3/s

8.5 m3/s

4.    OTHER FEATURES (from study report)

a. Headworks
Weir
Type Free flow Concrete
Crest Elevation, m amsl

Length, m

Deck level

Number of gate at weir

Number of gate at undersluice

860

60

869

5

1

Intake
Number of opening 4
Width of opening, m 3.0
Height of opening, m 1.25
Gravel trap
Type

Number of bays

Hopper

2

L x B x H, m

Approach canal

L x B x H, m

9 x 8.75 x 4.7

114 x 4 x 3.3

Settling Basin
Numbers

L x B x H, m

Forebay

Shape

L x B x H, m

Normal operating   level, m amsl

Power culvert

L x B x H, m

2

120 x 15 x 7.5

Trapezoidal

15 x 20 x 4.47

862.70

150 x 3.8 x 3.8

b. Headrace tunnel
Shape Inverted D-shape
Length, m 4197.6
Size, m x m (concrete lined)

Size, m x m (shotcrete lined)

Invert level of tunnel intake

Invert lining thickness for shotcrete lined, mm

‘Invert lining thickness for concrete lined, mm

Adit 1

Shape

Length, m

Size, m x m

Adit 2

Shape

Length, m

Size, m x m

Adit 3

Shape

Length, m

Size, m x m

3.8 x 3.8

4.5 x 4.5

852.175m amsl

200.00

300.00

Inverted D- shape

388.2

4.5 x4.5

Inverted D- shape

241.00

4.5 x4.5

Inverted D- shape

58.22

4.5 x4.5

c. Surge tank
Diameter, m 12.0
Height, m 42.8
Invert level of surge tank, m amsl 840.20
Full supply level, m amsl

Maximum upsurge, m

Maximum down surge, m

862.15

877.46

843.20

d. Steel penstock pipe
Thickness of penstock, mm 14 to 16
Length, m 140.0
Average diameter, m 3.4
e. Vertical shaft
Length, m 63.0
Diameter, m 3.8
f. Power house
Elevation of access floor, m amsl 783.40
L x B, m 30.0 x 16
g. Tailrace
Length, m 293
L x B, m 4.0 x 3.8
h. Turbine
Type Francis (vertical axis)
Numbers 2
Turbine rated capacity 10.0 MW
i. Transmission line
Length, km 4.5 km at Modi Hydropower Plant S/S
Capacity, kV 132 kV, single circuit
4.    ENERGY
a. Design Discharge , m3/s 27.5
b. Gross Head, m 93.70
c. Installed capacity, MW 20
d. Gross Average Annual Energy, GWh 124.24
5.    Project development cost NPR 3,509,281,000 after financing
Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW