cmail

Project Title: Bhairabkund Small HP

innerImage
  • Task: Feasiblity study &Tender document preparations

  • Capacity: 3 MW

  • Status: Completed

Salient Features (as per Feasibility Study Report, 2009):
Location : Bhairabkund Khola (Tributary of Bhotekoshi khola), Tatopani VDC, Sindhupalchowk District, Central development region of Nepal.
Latitude : 27o55’52”N to 27o56’30”
Longitude : 85o55’53”E to 85o56’28”

Purpose of project : To supply for domestic use and promote rural development in the most economically viable way.
Geology
Region : Lesser Himalayan Crystalline Zone
Rock composed : Gneiss, schist, schistose phyllite and quartzite
Geotechnical zoning : Fair to good
Hydrology
Catchment area : 21.00 km2
90% firm flow in the driest month : 0.52 m3/sec
Design flow (Q53) : 1.70 m3/sec
Flood 1 in 100 years : 141.52 m3/sec
Weir
Type : RCC gravity
Size : 6.50 x 11.0m x 4.5 m (w x l x h)
Crest level : 1638.80 masl
Intake
Type : Tyrolean and side intake
1. Tyrolean Intake
Size : 1.60 x 6.00 x 0.9(w x l x h)
Crest level : 1638.50 masl
Bottom level : 1636.75 masl
Gate : 2 nos.
2. Side Intake (to be operated optionally)
Number of orifice : 2 nos.
Size : 1.75 x 1.0 m (w x h)
Top level orifice : 1638.8 masl
Bottom level orifice : 1637.8 masl
Gate : 2 nos.
Gravel trap
Type of Structures : Surface
Length : 7.5 m (including transition)
Width : 3.50 m
Average Height : 4.9 m
Normal water level : 1637.10 masl
Spillway level : 1638.00 masl
Spillway length : 5.00 m
Flushing, stoplog gates : 2 nos.
Coarse trash rack : 1 nos.
Coarse trash rack size : 3.86 x 3.17 m (w x h)
Flushing culvert length : 23.7m
Flushing culvert size : 1.20 x 1.00 (h x w)
Canal from Gravel Trap to Settling Basin
Type : Rectangular with concrete wall and base
Length : 6.00 m
Bottom width : 3.50 m
Height : 3.37 m
Settling basin
Type of structure : Surface
Length : 36.0 m (including transition)
Chamber width : 3.50 m each
Chamber height : 4.54 m
No. of chambers : 2 nos
Sand flushing channel size : 2 nos., 1.00 x 0.60 m (w x h) steel lined
Flushing gates : 4 nos. (2 for each chamber)
Settling basin outlet gates : 4 nos. (2 for each chamber)
Normal water level : 1637.02 masl
Tunnel intake chamber
Surface area : 56 m2
Normal water level : 1636.77 masl
Fine trash rack : 3.15 x 2 m (w x h)
Tunnel
Length : 680.00 m
Shape : Rectangular with semicircular roof
Size : 2.00 x 2.50 (b x h)
Cross sectional area : 4.57 m2
Support : Shortcrete lining and Rock bolt
Surge shaft
Internal diameter : 3.50 m
Height : 12.0 m (minimum)
Support : RCC/ Shortcrete lining
Penstock Pipe :
Material : Steel
Length : 370.00 m
Internal diameter : 1.00 m
Thickness : 6 mm-20 mm
Anchor blocks : 10 nos.
Saddle supports : 62 nos.
Trifurcation pipe : 1 nos.
Branching : 2 pipes of 0.7m diameter
Powerhouse
Type : Surface
Size : 24.60 x 10.25 (l x w)
Number of generating units : 2 units
Turbine type : Horizontal Axis Pelton Turbine
Installed capacity : 3000 KW
Level of Turbine Nozzle center line : 1410.00 masl
Switchyard
Type : Outdoor
Area : 12 x 16 m
Tailrace
Type : Rectangular box closed duct and open channel
Length of closed duct : 24.63 m
Size of Tailrace culvert : 2 x 1.2m (w x h)
Transmission Facilities
Transmission line Length : 31km from Powerhouse to Sunkoshi through proposed Chaku Sub-station
Voltage level : 33 KV
Power and Energy
Gross Head : 226.77 m
Net Head at design discharge : 222.73 m
Installed Capacity : 3000 KW
Gross annual energy : 19.25 GWh
Net annual energy : 18.67 GWh
Wet Energy : 15.20 GWh
Dry Energy : 3.47 GWh
Access road/Construction Road
Length : 3.00 Km (proposed)
Alternative : Airlift or Ropeway
Financial Indicators
Energy rate, NPR/KWh : NPR 4.62/KWh at base year** and 3% escalation up to 9 times from generation year (From the dry season rate of NPR7.0 and wet season rate of NPR 4.0)
Base Case:
Benefit Cost ratio (B/C ratio) : 1. 25
Internal Rate of Return, (IRR) : 14.29%
Return on Equity (FIRR, 70/30 ratio) : 17.57%
Net Present worth, (NPV, at 10% discount rate) : 149 MNPR
Project Development Cost : 455 MNPR
Cost per kW, USD/kW (at 1 USD=78 NPR) : 1944.44 USD/kW
* The financial indicators are tentative and subject to change after the PPA energy rates are finalized within the validity of unit costs considered in year December 2007.

Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations