Project Title: Tinekhu Khola Small HP

innerImage
  • Task: Feasibility study

  • Capacity: 990 KW

  • Status: Completed

Salient features: as per Feasibility Study Report, 2010
Location Tinekhu Khola, Suri/Jhaku VDC’s, Dolkha District, Janakpur Zone, Central development region of Nepal
Latitude 27°44’07” N to 27°45’15” N
Longitude 86°10’45” E to 86°12’06” E.
Geology
Region Middle Mountain Zone
Rock composed Quartzite, Schist, Augen Gneiss, Phyllite
Geotechnical zoning Fair to good
Hydrology
Catchment area 21 km2
90% firm flow in the driest month 250 lps
Design flow (Q57) 350 lps
Flood 1 in 100 years 127 m3/sec
Weir
Type Concrete and gabion
Length 18.25m
Crest level 1398.6 m amsl
Intake
Type Side intake
Number of orifice 3
Orifice Size 0.4 x 1.00 m (w x h)
Sill level upper orifice 1398.90 m amsl
Sill level bottom orifice 1397.90 m amsl
Number of gates 2
Gravel trap
Type Surface
Length 3.0 m (including transition)
Width 1.5 m
Height 2.8 m
Normal water level 1398.30 m amsl
Spillway level 1398.60 m amsl
Gravel Flushing Canal
Type Surface
Length 7.40 m
Breadth 0.5 m
Height 0.5 m
Number of gates 2 nos.
Approach canal
Type Reinforced concrete rectangular culvert
Length 9.15 m
Bottom width 0.8 m
Height 0.8 m
Settling basin
Type Surface
Size 23.5 x 1.5 x 3.0m (l x b x h)
No. of chambers 2
Normal water level 1398.27 m amsl
No. of flushing channel 2
Sediment Flushing Channel
Type Surface
Length 8.0 m
Breadth
Height 0.5 m
No. of gates 2
Headrace pipe
Material High Density Polyethylene (HDPE)
Length 2046 m
Internal diameter 500 mm
Anchor blocks 43 nos.
Forebay
Type Surface
Width 3.5 m
Length 4.0 m
Height 4.0 m
Water level 1387.34 m amsl
Penstock Pipe
Material Steel
Length 960 m
Internal diameter 450 mm
Thickness 8-32 mm
Anchor blocks 16 nos.
Saddle support 107 nos.
Y-Bends 1 no.
Branching 2 pipes of 320 mm internal diameter, 20 m long
Powerhouse
Type Surface
Length 16.5 m
Breadth 8.0 m
Height 12 m (from foundation level)
Number of generating units 2 (Two) each 495 MW
Turbine type Horizontal Axis Pelton Turbine
Installed capacity 990 KW
Turbine axis level 985.61 m amsl
Tailrace
Type Rectangular box culvert
Length of closed duct 40.8 m
Transmission Facilities
Transmission line Length 3 km from Powerhouse to to Singati Sub-station
Voltage level 11 KV
Power and Energy
Gross Head 412 m
Net Head at design discharge 388.40 m
Installed Capacity 990 KW
Gross Annual Energy 7.48 GWh
Net Annual energy 7.10 GWh
Wet Energy 5.20 GWh
Dry Energy 1.90 GWh
Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS