cmail

News

Contract Agreement with Sanima Hydropower Limited

innerImage

On 1st February 2016, Sanima Hydro and Engineering signed a contract agreement for feasibility study of Jum Khola Hydropower Project (62 MW). The project is owned by Sanima Hydropower Limited (Parent organization). The project is a simple run of river type project located in Lamabagar VDC , Dolakha district of Nepal. The design discharge of the project is 28.16 m3/s… Read More »


Peace Energy Company Pvt. Ltd. contract agreement.

innerImage

Peace Energy Company Pvt. Ltd. signed a contract agreement to carry on its feasibility study of Upper Kabeli Hydropower Project (15.2 MW) with Sanima Hydro and Engineering. The contract agreement was signed on 6th March 2016, moreover the survey works are ongoing. The project is a simple run of river (Kabeli khola) type project located in Taplejung district of Nepal… Read More »


Contract agreement with Super Mai Hydropower Pvt. Ltd

innerImage

Sanima Hydro and Engineering (P.) Ltd has signed a contract agreement with Super Mai Hydropower Pvt. Ltd. on 8th October 2015 for Due Diligence Study of Super Mai Hydropower Project (7.8 MW). The project is a run-of-river having its components located at Sumbek, Barbote, Soyang VDC, Ilam District. As per the feasibility study report, the installed capacity is 7.2 MW with… Read More »


Contract agreement with Sanigad Hydro Pvt. Ltd

innerImage

Sanima Hydro and Engineering (P.) Ltd has signed a contract agreement with Sanigad Hydro Pvt. Ltd on 14th October 2015 for Review of Feasibility study and Detailed Engineering Design of Upper Kalanga Gad Hydroelectric Project (38.4 MW). The project site is located in Kalanga Gad (River), Bajhang District of Far Western Development Region of Nepal. It is a run-of-river project with… Read More »


Contract agreement with Numbur Himalaya Hydropower Pvt. Ltd.

innerImage

Sanima Hydro and Engineering (P.) Ltd has signed a contract agreement with Numbur Himalaya Hydropower Pvt. Ltd. on 1.March.2016 for Preparation of Detailed Engineering Designs, Construction Drawings, BoQ, Tender and Contract Documents of Likhu A Hydroelectric Project. The project site is located in Likhu River, Solukhumbu/Ramechhap District of Eastern Development Region of Nepal. It is a run-of-river project with gross head… Read More »


Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations