Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Sanima Middle Tamor Hydropower Limited to conduct Construction Supervision of Middle Tamor Hydropower Project (73 MW) on 21th September 2017. The project is located in Taplejung District of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 73 MW, design discharge 73.71 m3/sec,… Read More »