Contract agreement signed with Chauri Hydropower Pvt.Ltd. for Due Diligence study of Chauri khola. Hydroelectric Project (5MW) on 26th July 2015. The Project is a simple run of river type project located in Kavrepalanchowk district of Nepal with a design discharge of 4.36m3/s and gross head of 150.50m.