Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Tamor Sanima Energy Pvt. Ltd. for the Consulting Services for Detailed Engineering Design and Design Support During Construction of Upper Tamor Hydropower Project (285 MW) on 4th August, 2022. The project is located in Taplejung District, Province – 1 of Nepal. It has been planned as a Peaking run-of-river (PRoR) type scheme with an installed capacity of 285 MW, design discharge at 69 m3/sec and gross head of 450 m.