The project is a run-of-river having its components located at Sumbek, Barbote, Soyang VDC, Ilam District. As per the feasibility study report, the installed capacity is 7.2 MW with design discharge of 7.34 m³/s at Q40 and gross head of 125.8 m.
The project is a run-of-river having its components located at Sumbek, Barbote, Soyang VDC, Ilam District. As per the feasibility study report, the installed capacity is 7.2 MW with design discharge of 7.34 m³/s at Q40 and gross head of 125.8 m.