Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Super Madi Hydropower Limited to conduct Construction Management and Construction Supervision of Super Madi Hydroelectric Project (44 MW) on 9th April 2018. The project is located in Madi Gaupalika of Kaski
District of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 44 MW, design discharge 18 m3/sec, gross head of 306.5 m.