Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with River Side Hydro Energy Pvt. Ltd. for Consulting Services for Due Diligence Study and Detailed Engineering Design of Tamor Khola-5 Hydroelectric Project (37.52 MW) on 24th December, 2020. The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 37.52 MW, design discharge 55.0 m3/sec, and gross head of 80 m.