cmail

News

Contract Agreement with Nepal Infrastructure Bank Ltd. & Jhyamolongma Hydropower Development Company (P.) Ltd. for Due Diligence Study.

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Nepal Infrastructure Bank Ltd. & Jhyamolongma Hydropower Development Company (P.) Ltd. to conduct Due Diligence Study of Karuwa Seti Hydropower Project (32 MW) on 30th October 2020.  The project is located in Kaski district, Gandaki Province of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 32 MW, design discharge 15.3 m3/sec, and gross head of 248.45 m.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations