Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Nepal Infrastructure Bank Ltd. & Jhyamolongma Hydropower Development Company (P.) Ltd. to conduct Due Diligence Study of Karuwa Seti Hydropower Project (32 MW) on 30th October 2020. The project is located in Kaski district, Gandaki Province of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 32 MW, design discharge 15.3 m3/sec, and gross head of 248.45 m.