Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Nepal Bank Limited and Samyukta Urja Pvt. Ltd. to conduct Due Diligence Study of Thulo Khola Hydropower Project (21.30 MW) on 22nd July 2020. The project is located in Myagdi district, Gandaki Province of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with an installed capacity of 21.30 MW, design discharge 7.30 m3/sec, and gross head of 354.50 m.