Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Mewa Developers Ltd. for Due Diligence Study of Siwa Khola Hydropower Project (9.3 MW) on 20th June, 2022. The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 9.3 MW, design discharge at Q42.07% of 6.2 m3/sec, and gross head of 177.51 m and net head of 173.33m.