Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Mathillo Mailun Khola Jalvidhyut Limited to conduct Detailed Design and Construction Supervision of Mathillo Mailung Jalvidhyut Aayojana (14.3 MW) on 1st February 2018. The project is located in Uttargaya rural Municipality of Rasuwa district, Province No. 3 in Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 14.3 MW, design discharge 3.53 m3/sec, gross head of 495.5 m.