Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Mathillo Mailun Khola Jalvidhyut Limited for the Consulting Services for Detailed Engineering Design and Tender Documents Preparation of Madhya Mailung Khola Jalvidhyut Aayojana (13 MW) on 20th January, 2022. The project is located in Rasuwa District, Bagmati Province of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 13 MW, design discharge at Q40 3.53 m3/sec, gross head of 461.93 m and net head of 454.21 m