Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Integrated Hydro Fund Nepal Pvt. Ltd. for Consulting Services for Due Diligence Study of Upper Brahmayani Hydroelectric Project (15.15 MW) on 10th December, 2021. The project is located in Sindhupalchowk district, Bagmati Province of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 15.15 MW, design discharge at Q45 4.02 m3/sec, and gross head of 463.0 m and net head of 444.44.