cmail

News

Contract Agreement with Integrated Hydro Fund Nepal Pvt. Ltd. for Consulting Services for Due Diligence Study

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Integrated Hydro Fund Nepal Pvt. Ltd. for Consulting Services for Due Diligence Study of Upper Brahmayani Hydroelectric Project (15.15 MW) on 10th December, 2021. The project is located in Sindhupalchowk district, Bagmati Province of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 15.15 MW, design discharge at Q45 4.02 m3/sec, and gross head of 463.0 m and net head of 444.44.

Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations