cmail

News

Contract Agreement with Happy Energy Pvt. Ltd. for Review Report

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Happy Energy Pvt. Ltd. for Consulting Services for Review Report of Upper Sankhuwa Khola Hydroelectric Project (40 MW) on 15th February, 2021. The project is located in Sankhuwasabha district, Province No.1 of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 40 MW, design discharge 9.75 m3/sec, and gross head of 481.69 m.

Recent News
recentImage Construction Supervision and Design Support During Construction
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically, the project area is… Read More »
VIEW ALL NEWS
National Projects
national

Solu Hydroelectric Project
Capacity: 23.5 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations