Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Dhaulagiri Kalika Hydro Ltd. for Consulting Services for Due Diligence Study of Darbang Myagdi Hydroelectric Project (25 MW) on 15th August, 2021. The project is located in Myagdi district, Gandaki Province of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 25 MW, design discharge at Q40 31.40 m3/sec, and gross head of 100.60 m.