Sanima Hydro & Engineering Pvt. Ltd signed a Tripartite contract agreement with Citizens bank International Limited and Him Parbat Hydropower Pvt. Ltd to conduct Due Diligence study of Sagu Khola Hydropower Project (20 MW) on the 27th of September 2020. The Project is Run of River (RoR) located at Dolakha District.