cmail

News

Contract agreement for Detailed Design of Super Nyadi Hydropower Project (40.27 MW)

innerImage

Sanima Hydro and Engineering (P.) Ltd and Siuri Nyadi Power Pvt. Ltd., Nepal signed a contract agreement on 12th September 2016  to carry out detailed engineering design of Super Nyadi Hydropower Project (40.27 MW). The project is located in Lumjung district of Gandaki Zone, Nepal. The project components are located in right bank of Nyadi Khola within Bahundanda VDC. It is a run-of-river project with gross head of 697.7 m, design discharge of 6.96 m3/s and total gross energy generation of 234.44GWh.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations