Sanima Hydro and Engineering (P.) Ltd and Siuri Nyadi Power Pvt. Ltd., Nepal signed a contract agreement on 12th September 2016 to carry out detailed engineering design of Super Nyadi Hydropower Project (40.27 MW). The project is located in Lumjung district of Gandaki Zone, Nepal. The project components are located in right bank of Nyadi Khola within Bahundanda VDC. It is a run-of-river project with gross head of 697.7 m, design discharge of 6.96 m3/s and total gross energy generation of 234.44GWh.