Contract Agreement between Swet Ganga Hydropower and Construction Ltd. And Sanima Hydro and Engineering Pvt. Ltd.

Sanima Hydro and Engineering Pvt. Ltd. Has signed a contract agreement with Swet Ganga Hydropower and Construction Ltd. for Feasibility Study of Tallo Likhu Cascade Jalvidhyut Aayojana (9500 kW) on August 27, 2023.  Tallo Likhu Cascade Jalvidhyut Aayojana is a Run-of-River (RoR) having an installed capacity of 9500 kW located at Likhu Tamakoshi Rural Municipality, ward no. 4, and Ramechhap Municipality, ward no. 1 of Ramechhap District & Likhu Rural Municipality, ward no 3 and 4 of Okhaldhunga District. Geographically, the project area is located between latitudes 270 22’ 00” N to 270 23’ 23” N and longitudes 860 13’ 10” E to 860 14’ 02” E. The project utilizes gross head of 41.0 m, and design discharge of 29.75 m3/s.

Recent News
recentImage Due Diligence Audit of Tallo Madhya Rawakhola Hydropower Project (4 MW)
Sanima Hydro and Engineering Pvt. Ltd. has signed a Contract Agreement with Lower Mid Rawakhola Hydropower Ltd. on 29th October 2023 for Due Diligence Audit of “Tallo Madhya Rawa Khola Hydropower Project (4 MW)”. It is a Run of River (RoR) project having installed capacity of 4 MW being developed by Lower Mid… Read More »
VIEW ALL NEWS
National Projects
national

Tallo Madhya Rawa Khola Hydropower Project
Capacity: 4 MW
Status: Ongoing