Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Mathillo Mailun Khola Jalvidhyut Limited to conduct Feasibility Study of Upper Mailung ‘B’ Hydropower Project (7.5 MW) on 17th June 2018. The project is located in Uttargaya rural Municipality of Rasuwa district, Province No. 3 in Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 7.5 MW, design discharge 2.8 m3/sec, gross head of 483.50 m.