cmail

News

Contract Agreement with United Mewa Khola Pvt. Limited for Detailed Engineering Design, Tender Document Preparation and Design Support during Construction.

innerImage

Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with United Mewa Khola Hydropower Pvt. Limited to conduct Detailed Engineering Design, Tender Document Preparation and Design Support during Construction of Mewa Khola Hydroelectric Project (50 MW) on 31st January 2018.  The project is located in Taplejung district, Province No. 1 in Nepal. It has been planned as a run-of-the-river (RoR) type scheme with installed capacity of 44 MW, design discharge 33 m3/sec, gross head of 191.8 m.

Recent News
recentImage MoU Signing Ceremony with Sanima Hydro and Engineering Pvt. Ltd.
MoU Signing Ceremony: Bridging Academia and IndustryBetween Advanced College of Engineering and Management and Sanima Hydro and Engineering Pvt. Ltd.  In a significant step toward strengthening industry-academia collaboration, the Advanced College of Engineering and Management (ACEM) has signed a Memorandum of Understanding (MoU) with Sanima Hydro and Engineering Pvt. Ltd., one of Nepal’s leading… Read More »
VIEW ALL NEWS
National Projects
national

Upper Sankhuwa Hydropower Project
Capacity: 40 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
Contact Address
KMC-04, Dhumbarahi Kathmandu, Nepal P.O.Box-19737
Phone: 00977-1-4372828/4373030/4015788
Fax: 977-1-4015799
Email: engineering@sanimahydro.com
footlogo
Website Design & Web Development by Axil Creations