  • Task: Progress Monitoring and Bill Verification

  • Capacity: 25 MW

  • Status: Ongoing

Salient Features:
The salient features of the project based on updated documents provided by the Developer on 20 May 2014 are given below:
Location and Type
River : Khani Khola
River type : Snow Fed
Location : Khare and Marbu VDCs, Dolakha District, Janakpur,     Nepal
Type of Project : Run-of-River (RoR)
Licensed Co-ordinates : 27º 47′ 48″ N, 86º 20′ 00″ E, 27º 50′ 28″ N, 86º                 22′ 00″     E
Purpose of the project : To supply for domestic use by connecting to national grid.
Hydrology
Design Discharge (Q40) for 25 MW : 3.20 m3/s
100 year flood at intake : 130.12 m3/s
Catchment Area : 52 Km2
Average Monthly flow (overall) : 5.14 m3/s
Diversion Weir
Type : Boulder lined broad crested weir
Normal water level : 3,388 .00 m amsl
High flood level : 3391.42 m amsl
Length : 10.00 m
Weir height : 3.00 m
Intake
Type : Side intake
No. of openings : Two
Size of Opening : 4 m (W) x 1 m (H)
Design discharge : 3.84 m3/s
Orifice Invert Level : 3386.50 m amsl
Under sluice
Type : Orifice flow
Design Discharge : 25.93 m3/s
No. Of bay : 1
Height : 2.2 m
Width : 2.00 m
Gravel Trap
Normal water level : 3387.81 m amsl
Gravel : 9.0 m
Dimension : 4.0 m (W) x 4.7 m (H)
Bed slope : 1 in 20
Gravel trap flushing system : Intermittent
Connecting Pipe
Flow type : Free flow
Diameter : 1.50 m
Length : 240 m
Flow depth : 1.20 m
Slope : 1 in 175
Design discharge : 3.52 m3/s
Feeder Tunnel
Support type : Shotcrete and concrete lined
Flow type : Free flow
Internal size (W x H) : 2.2 m x 2.2 m D shaped
Length : 190 m
Flow depth : 1.20 m
Slope : 1 in 255
Design discharge : 3.52 m3/s
Bifurcated Feeder Tunnel
Support type : Shotcrete and concrete lined
Flow type : Free flow
Number : 2
Internal size (W x H) : 2.0 m x 2.0 m D- shape
Length : 29.0 m each
Flow depth : 1.20 m
Slope : 1 in 775
Design discharge : 3.52 m3/s
Settling Basin/ Desander
Type : Underground
Support type : Shotcrete and concrete lined
Flow type : Free flow
Particle size : 0.15 mm
Design discharge : 3.52 m3/s
No of bays : Two
Effective dimension : 48.00 m x 6.00 m x 8.35 m (L x B x H)
Length of Inlet transition : 10.0 m
Normal water level : 3385.62 m amsl
Longitudinal slope : 1 in 50
Flow velocity : 0.15 m/s
Flushing system : Hopper type
Flushing gate size (W x H) : 1.00 m x 1.00m
Flushing pipe : 600 mm dia. 34 m long
Flushing/Access Tunnel
Size (W x H) : 4.50 m x 5.0 m D- shape
Length : 118.0 m
Slope : 1 in 50
Size of flushing canal : 1.00 x 1.00 m
Headrace Tunnel
Support type : Shotcrete and concrete lined
Length : 1958 m
Slope : 1 in 9.24
Size : 2.5 m x 3.0 m D-shape
Type : Pressure flow
Adit
Length : 144.30 m
Slope : 1 in 10
Size : 2.5 m x 3.0 m D- shape
Surge Shaft (Penstock pipe and Forebay)
Penstock pipe
Internal diameter : 1.20 m
Length : 500 m
Thickness : 8 to 14 mm
Steel type : X56
Forebay
Shape : Rectangular
Dimension (L x B x H) : 10 m x 6 m x 11.34 m
Normal water level : 3385.59 m amsl
Length of spillway : 3.00 m
Penstock Pipe
Internal diameter : 1.20 m
Total length up to 1st bifurcation : 1319.68 m
Thickness : 8 to 30 mm
Design discharge : 3.20 m3/s
Steel type : X56 and X80
Powerhouse
Type : Underground
Size (L x B x H) : 55 m x 13 m x 16.23 m
Turbine centre line elevation : 2425.85 m amsl
Type of Switchyard : Outdoor
Main Access Tunnel
Shape : Inverted D – shaped
Size : 5 m x 5 m (W x H)
Length : 217 m
Slope : 1 in 1000
Tail Race Tunnel
Shape : Inverted D- shape
Size : 2 m (W) x 2.2 m (H)
Length : 210 m
Slope : 1 in 300
Transmission Line
Length : 23 km to Singati S/S
Type : 132 kV
Access Road
Classification : District road
Surface : Gravel
Length : 30 Km
Starting point : Bhorle
Ending point : Hanapu (Powerhouse) and HRT outlet portal to Headworks
Formation width : 5 m
Carriage width : 3.5 m
Shoulder width : 0.5 m (both sides)
Side drain : Angular
Electro-Mechanical Equipment
Turbine type : Pelton
No of units : 3
Turbine speed : 750 rpm
Turbine efficiency : 90%
Generator type : A.C synchronous
Rated frequency : 50 Hz
Rated voltage of generator : 6.6 kV
Transformer type : 3-phase ONAN, outdoor
Rated capacity of transformer : 15,300 KVA.
Power and Energy
Installed capacity : 25 MW
Gross head : 963.00 m
Net head : 940.00 m
Annual energy : 171.64 GWh.
Annual dry energy : 34.78 GWh.
Annual wet energy : 136.86 GWh.
Plant factor : 78%
Recent News
recentImage Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW)
Sanima Hydro and Engineering Pvt. Ltd. has signed a contract agreement with Sanima Jum Hydropower Limited on 14th February 2024 for Construction Supervision and Design Support During Construction of Jum Khola Jalvidhyut Aayojana (56 MW). Jum Khola Jalvidhyut Aayojana is a Run-of-River (RoR) project located at Dolakha District, Bagmati Province of Nepal. Geographically,… Read More »
VIEW ALL NEWS
National Projects
national

Jum Khola Jalvidhyut Aayojana
Capacity: 56 MW
Status: Ongoing
VIEW MORE PROJECTS
International Projects
nationalHRE III
Capacity:
Status: Ongoing
VIEW MORE PROJECTS
footlogo
Website Design & Web Development by Axil Creations