Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Snow Rivers Pvt. Ltd. to conduct Due Diligence Study and Detailed Engineering Design of Super Kabeli Khola-A Hydropower Project (13.50 MW) on 24th December 2020. The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with an installed capacity of 13.50 MW, design discharge 3.34 m3/sec, and gross head of 502 m.