Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Hilton Hydro Energy Pvt. Ltd. to conduct Due Diligence Study and Detailed Engineering Design of Super Kabeli Khola Hydropower Project (12 MW) on 24th December 2020. The project is located in Taplejung district, Province No.1 of Nepal. It has been planned as a run-of-the-river (RoR) type scheme with an installed capacity of 12 MW, design discharge 5.90 m3/sec, and gross head of 259 m.